Florida Polytechnic University’s Board of Trustees has signed off on a new residence hall, a dining hall and more parking at the Lakeland school’s campus.
The expansion comes as Florida Poly continues to experience record enrollment and increased demand for on-campus housing. Enrollment this Fall reached more than 2,340, a 35% increase over the previous two years. Existing residence halls at the school are fully occupied.
Florida Poly expects enrollment to reach 3,000 by 2030.
“Our University is seeing tremendous growth, and our campus must be ready to meet that demand. Our students deserve facilities that match the quality of the education they’re receiving,” Florida Poly President Devin Stephenson said.
“We’re building a campus that reflects their ambition and potential while creating an environment where they can thrive. This investment is about meeting their needs today while preparing our University for the opportunities ahead.”

The new residence hall will hold 600 beds for Florida Poly students, housed within a more than 159,000-square-foot building. It will be the school’s fourth residence hall after a 430-bed facility opened in 2024. The new hall will feature both single- and double-occupancy suites, as well as study rooms, collaborative spaces, a community kitchen and lounges.
Also planned is a nearly 28,000-square-foot dining facility to support the new residences, including seating for 740 people. The dining facility will have an outdoor patio and a variety of dining options, including made-to-order meals and an allergen station.
The expansion also adds about 500 parking spaces to accommodate student and faculty growth at Florida Poly.
“As Florida Poly continues to grow, so do the needs of its students and its campus,” said Geoff Eisenacher, Vice President of Development at Gilbane Development.
“The University is making an important investment in its students by enhancing the campus experience for those here today while creating the capacity to welcome more students pursuing an education in STEM. Gilbane is proud to partner with Florida Poly as it plans for this continued growth and creates a more connected campus experience that will serve students for years to come.”

Gilbane Development is the project lead, with Gilbane Building overseeing construction. Design Collective is directing architecture and interior design. Work is slated to start in the Spring, with the buildings set to open by Fall 2028.

Dining and Cooking